EDUCATION
S2 Teknik Sipil (Geoteknik) - Institut Teknologi Bandung, (2019 – 2021)
S1 Teknik Sipil - Universitas Pendidikan Indonesia, (2014 – 2018)
SMA Negeri 2 Kota Bandung, (2011 – 2014)
Experiences
- Position: Senior Geotechnical Engineer (Supervised by Made Suarjana, Ph.D., M. Riyansyah, Ph.D., & Fritz R.P Nababan, Ph.D.)
- Company: PT. IREC Reka Yasa, PT. LAPI Ganeshatama, PT. Suarluna Triplana Rekayasa
- Period: September 2021 – Present
-
Projects:
- March 2021 – May 2022: Tender Preparation for Terminal Peti Kemas Kalibaru Phase 2B: Analysis of Wharf Stability, Vacuum Soil Improvement Stability, and Breakwater Stability.
- Nov 2021 – Dec 2021: SSRA Ash Landfill Area PLTU Jawa 9 & 10 Suralaya.
- Nov 2021 – Dec 2021: Review of Basement Excavation Design (Open-Cut and Reinforced) for Transmart Bintaro.
- March 2022: Coal Shed: Lateral Force Analysis on Piles Due to Coal Stockpile.
- March – April 2022: Manado Bitung Toll Road, Pinokalan Bridge Section: Surface Slope Analysis and Abutment 1 Handling.
- April 2022: PLTU Jawa 9 & 10 Suralaya, Banten: RCPP Pipeline Flexible Joint Settlement Analysis.
- April 2022: PLTU Jawa 9 & 10 Suralaya, Banten: Liquefaction Analysis for Cooling Water Pump House Intake Excavation.
- June 2022: Light Rapid Transit (LRT) Cawang – Harjamukti: Pedestrian Excavation Stability Analysis.
- May 2022: EPC Tuban Jetty Upgrade Project: Foundation Optimization for Clinker, Blending, and Cement Silo Areas.
- Aug 2022: LRT Line 1 (Cawang - Cibubur): Pedestrian Slope Stability Analysis at Harjamukti.
- Oct 2022: PLTGU Tambak Lorok (600–850 MW) Semarang: Evaluation of Existing Sheet Pile Removal.
- Nov 2022: Serpong Cinere Toll Road: Review of Existing Conditions and Proposed Handling for Kemiri DPT Section 2.
- Nov 2022: Gunung Wugul PLTM, Banjarnegara, Central Java: Permanent Improvement Design for Penstock Area Landslide.
- Dec 2022: Revised DED for Ujoh Bilang Airport, East Kalimantan: Stability Analysis for Runway, Apron, and Taxiway Slopes.
- Aug 2023 – Nov 2023: Structural Performance Analysis of PT. Paragon Technology and Innovation, Jatake 1 Building.
- Jan 2023 – Present: EPC Construction of Open Access for PT Pertamina RU-VII Kasim: Soil Improvement Analysis for Tank Area.
- Dec 2023 – Present: Review of DED for Tanah Grogot Airport, Paser Regency: Slope Stability and Soil Improvement Methods for Runway, Apron, and Taxiway.
- Position: Junior Geotechnical Engineer (Supervised by Fritz R.P Nababan, Ph.D.)
- Engagement: Independent Expert
- Period: February 2021 – September 2021
-
Projects:
- August – September 2020: Trans Sumatera Toll Road (Termanggi Besar – Pematang Panggang Sta. 0+680 – Sta. 0+725): Back-analysis of landslide slope.
- November 2020 – April 2021: SSRA Analysis for Boiler, Chimney, Turbine, and Reclamation Areas of PLTU Jawa 9 & 10 Suralaya: Site class analysis, baseline correction, SSRA tripartite envelope analysis, and report preparation.
- April 2021: 11th Infrastructure Training (2nd Ground Improvement - Practical Implementation), Garuda Infrastructure - HATTI: Prepared materials on dynamic compaction and deep soil mixing.
- September 2021: Trans Sumatera Toll Road (Taba Penanjung – Bengkulu): Back-analysis of settlement at P4 Sta. 8+050.
- October – November 2021: Tambak Lorok: Evaluation and review of excavation conditions for D4 CCPP Block 3 Project (Dependable Capacity 600 – 800 MW).